We installed a bank of UPS batteries in Sant Jeroni, Montserrat

width="1140"

On Thursday, June 28th, we proceeded to Installing a UPS Battery Bank From the Sant Jeroni Relay Center (Montserrat) For the company Cellnex Telecom. The antenna is located more than 1,200 m above sea level. Given the difficulties of access by land vehicle, it was necessary to resort to a helicopter so that the technicians and the batteries of 2,500 Kg acces to the building.

The process was developed in a single day; Which meant the dismantling, assembly and removal of the elements. In order to reduce the start-up time of the ups and avoid cuts in power supply, the Tempel Group team coordinated the logistics and technical assistance. The knowledge and experience of our specialists made it possible to perform this service in record time, satisfying the demands of our clients.

The magazine and website FuturEnergy, currently a clear reference in the dissemination of Energy Sector Projects and technologies and the Energy efficiency, it echoes this news.

Call Now Button